HITEC City corridor · Serving since 2013

Batteries, inverters & solar in Madhapur

Most of our Madhapur work is not residential — it is offices. Server rooms, 3 kVA and 6 kVA rack UPS units, access-control panels and conference-room AV that must not blink during a client call. We started servicing the HITEC City corridor in 2013 and the requirement has been the same ever since: uptime measured in seconds, not hours.

The mistake we correct most often here is a UPS sized for the day-one load and never re-audited after three years of team growth. A 6 kVA unit carrying 5.8 kVA has no headroom, runs hot, and eats its battery string in eighteen months. We re-audit and right-size instead of selling a bigger box by default.

What we see on the ground in Madhapur

The Madhapur office belt runs on high-reliability feeders, so outages are short — but they are frequent and abrupt, which is exactly the profile that punishes an undersized battery string rather than a weak grid.

Typical 40-seat Madhapur office: 40 workstations, two switches, a small server rack, access control and emergency lighting — roughly 5–7 kVA of protected load, usually best served by a 6 kVA online UPS with a 20-minute string plus a DG changeover.

How we work in Madhapur

  • We schedule Madhapur UPS battery swaps before 9 am or after 8 pm so no working hour is lost.
  • Every commercial installation here leaves with a labelled string map and a load reading sheet — so the next engineer, ours or anyone's, is not guessing.
  • For co-working floors we quote per-cabin backup separately, because billing a whole floor for one tenant's load has never been fair.

Priority 4-hour response on commercial AMC contracts.

Our 6 kVA UPS was tripping on transfer every second week. Qwik audited the load, found we had grown from 28 to 46 seats without anyone re-checking, and staged the upgrade over one weekend. Zero downtime since.
Praveen K. · IT Manager, software firm in Madhapur

Madhapur questions we get asked

Do you offer an AMC for office UPS systems in Madhapur?

Yes — quarterly preventive visits with a load reading, battery internal-resistance check and a written report. We price it per kVA of protected load, not per site visit, so there is no incentive for us to under-visit.

Can you replace UPS batteries without shutting the office down?

In most cases yes, using a maintenance bypass if the UPS has one. If it does not, we do the swap in a pre-agreed window outside working hours.

Also reached on the Madhapur route

HITEC City · Ayyappa Society · Image Gardens · Kavuri Hills · Jubilee Hills Road No. 36

Before you spend a rupee

Size it yourself first, then check what it should cost. If the numbers don't agree with a quote you've received, tell us and we'll explain the difference honestly.