Comparison · 9 min read

On-grid, off-grid or hybrid: three different promises.

Bill savings, blackout behaviour, battery cost, subsidy eligibility and payback compared across the three rooftop solar architectures — no brands, just system design.

Rooftop solar is sold as one product but is really three architectures with three different jobs: cut the bill, survive without a grid, or do both.

Pick the architecture from how you answer one question — what should happen at 8pm during a power cut?

We compare technologies, not consumer brands. Within each technology the honest differences between reputable manufacturers are far smaller than the difference between the right and wrong technology for your usage.

At a glance

AttributeOn-gridOff-gridHybrid
Battery requiredNoYes, sized for autonomyYes, sized for essentials
Works during a power cutNo — shuts down for safetyYesYes, on the backed-up circuit
Net metering / export creditYesNot applicableYes, on most utilities
Typical payback3–5 years6–9 years5–7 years
Upfront cost per kWLowestHighestMiddle
MaintenancePanel cleaning, annual inspectionPanels plus battery carePanels plus battery care
Subsidy eligibilityCommonly eligible for residential schemesUsually notVaries by scheme and utility
Best fitReliable grid, high monthly billNo grid or extremely unreliable gridFrequent cuts plus a high bill

Strengths, trade-offs and price

On-grid

₹55,000 – ₹2,20,000 per system

Typically 1 kW to 5 kW residential, before subsidy.

  • Best rupees saved per rupee spent
  • No battery to buy, maintain or replace
  • Export credit turns the meter backwards on sunny days
  • Simplest system, fewest failure points
  • Goes dark during a power cut — by regulation, not by fault
  • Savings depend on the utility's net-metering policy
  • No resilience benefit whatsoever

Best for: Households with a reliable grid whose primary goal is a lower monthly bill.

Off-grid

₹1,20,000 – ₹3,30,000 per system

Cost is driven mostly by the battery bank, not the panels.

  • Complete independence from the utility
  • Works where a grid connection is absent or unusable
  • Full-house autonomy when sized correctly
  • Battery bank dominates cost and replacement cycle
  • Must be designed for the worst cloudy week, not the average day
  • Usually excluded from grid-linked subsidy schemes

Best for: Farms, remote sites, and locations where extending the grid is not realistic.

Hybrid

₹1,10,000 – ₹3,00,000 per system

Battery sized for essential loads, not the whole house.

  • Bill savings on sunny days plus backup at night
  • Battery sized for essentials keeps cost sensible
  • Can prioritise self-consumption over export
  • Future-proof — battery capacity can usually be extended
  • More complex commissioning and settings
  • Battery still needs replacing eventually
  • Payback sits behind a pure on-grid system

Best for: Homes with both a meaningful electricity bill and frequent outages — the most common Indian case.

Decide with numbers

Size it before you choose it.

Enter your actual appliances and outage pattern — the calculator sizes the system before anyone quotes you a number.

Run the backup calculator

Our engineering verdict

If your grid is stable, on-grid pays back fastest and every rupee spent on a battery slows that payback.

If your grid fails often, hybrid is almost always the right shape: solar carries the daytime load, a modest battery carries the essentials at night, and you keep export credit for the surplus.

Off-grid is an engineering answer to a connectivity problem, not a savings strategy. Choose it when there is no viable grid, not to make a point.

Questions we get asked

Why does on-grid solar stop working during a power cut?

Grid-tied inverters must disconnect when the grid is down so they cannot feed voltage back into lines that linemen may be working on. It is a safety requirement, not a defect.

How much roof area do I need?

Roughly 80–100 sq ft of shade-free roof per kW for standard panels. Sizing starts from your monthly units consumed, then checks whether the roof can hold it.

Can I add a battery to an existing on-grid system later?

Often yes, either by replacing the inverter with a hybrid unit or adding an AC-coupled storage unit. It costs more than doing it once, which is why the architecture decision matters up front.