
Load profile to assess
- Network and computer labs
- Administrative systems
- Classroom essentials
Planning checklist, not a measured Qwik installation. Final ratings follow a site assessment.
System direction
Distributed UPS for IT and sized inverter backup for selected circuits
Why the sizing changes
- Timetable and simultaneous usage
- Lab equipment power requirements
- Safe battery placement away from pupils
Request a quote